Preparation Communication

The Sign-Off:- once the necessary paperwork has been drawn up and agreement signed, technical drawings will be produced and work will shift from the design studio to manufacturing plant.

The Site Survey:- shortly after sign-off, a site meeting will be called for. We ask that you, your electrician and your plumber are present at the meeting as critical water and electrical points will be discussed and marked. It is imperative that these markings be preserved in the period prior to site work to ensure a smooth and hassle-free process once construction work commences on the site.

The Site Management:- shortly after the site survey meeting, your Designer will advise you of the proposed installation date so that you and your contractors can schedule works for the preparation of your site. A week before the proposed installation date, your designer will assess site readiness before issuing final delivery instructions.